Decking frame
Detailed photo of fixings for Newell posts
Deck Stage 1
Summer 2008 started the deck in front of the sun lounge at the cottage. Set the metal post supports into poured concrete (1m deep by 200mm diameter holes).
Deck Stage 2
The beams consisted of two 150mm by 50mm timbers bolted either side of the posts (100mm by 100mm) to support the decking frame.
Deck Stage 3
All beams in place and shingle over a weed suppressing fabric layed down.
Deck Stage 4
The 100mm x 100mm posts have been cut to the level of the beams and treated with end grain wood preserver.
Deck Stage 5
The decking frame, again 100mm by 50mm timber and noggins in place.
Deck Stage 6
Newell posts (100mm by 100mm Redwood planed and chamfered) in place.
Deck Stage 7
Detailed photo of the fixings for the Newell posts.
Deck Stage 8
Coach bolts were used to support the Newell posts.
Deck Stage 9
Detailed photo of the fixings for the Newell posts. Coach bolts were used along with a nogging behind the post for extra strength.
Deck Stage 10
The posts, beams and decking frame have been treated (should have done this before starting the build). Decking boards (125mm by 38mm Redwood) with a 5mm gap.
Deck Stage 11
Redwood handrail.
Deck Stage 12
Deck complete and treated measures 5m by 3.6m.